Queued Up: Interconnection Queue Data
Annual report and companion Excel dataset compiling and analyzing generator interconnection queue data (~97% of installed U.S. capacity), a key bottleneck for new energy siting.
Annual report and companion Excel dataset compiling and analyzing generator interconnection queue data (~97% of installed U.S. capacity), a key bottleneck for new energy siting.